computes average outgoing quality for a double-sampling plan.
AOQ2(replacement,)
where
replacement |
has the value 'REP' or 'NOREP', respectively, depending on whether nonconforming items are replaced with conforming items. |
N |
is the lot size, where . |
|
is the acceptance number for the first sample, where . |
|
is the rejection number for the first sample, where . |
|
is the acceptance number for the second sample, where . |
|
is the size of the first sample, where and . |
|
is the size of the second sample, where and . |
p |
is the proportion of nonconforming items produced by the process, where 0 < p < 1. |
The AOQ2 function returns the average outgoing quality for a Type B double-sampling plan in which nonconforming items are replaced with conforming items (replacement is 'REP') or not replaced (replacement is 'NOREP'). For details on Type B double-sampling plans, see Types of Sampling Plans.
For replacement, the average outgoing quality is
|
and for no replacement, the average outgoing quality is
|
where, in both situations,
|
|
|
|
|
|
|
|
|
|
|
|
and
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|