The TSQUARECHART statement produces a chart based on a principal component model that the MVPMODEL procedure computes. In a Phase I analysis, the statistics are computed by PROC MVPMODEL and read from the HISTORY= data set. In a Phase II analysis, the statistics are computed by the MVPMONITOR procedure from information about the principal component model specified in the LOADINGS= data set.
Table 13.3 summarizes the options available in the TSQUARECHART statement. For detailed descriptions, see the section Common Chart Statement Options.
Table 13.3: TSQUARECHART Statement Options
Option |
Description |
---|---|
Specifies the probability used to compute chart limits |
|
Creates contribution plots for points outside the control limits |
|
Specifies that a chart be displayed only if there are points lying outside the control limits |
|
Specifies the time interval between consecutive positions on a chart |
|
Specifies the distribution that is used to compute the control limits |
|
Suppresses creation of a chart |
|
Suppresses the horizontal axis label of a chart |
|
Suppresses the vertical axis label of a chart |
|
Specifies the number of horizontal axis plotting positions per panel |
|
Adds a footnote to a chart |
|
Adds a secondary footnote to a chart |
|
Specifies a title for a chart |
|
Specifies a secondary title for a chart |
|
Creates a SAS data set that contains a summary of a chart |
|
Specifies that separate sequences of observations be plotted on a single chart |
|
Specifies SERIES variable values selecting sequences to be plotted |
|
Specifies the number of panels used to display a chart |